Our First Total Gut Job
It's been a pretty crazy two months
The first thing we wanted to do was the kids room and bathroom. We lived on air mattresses in the kitchen and living room! We currently have our playroom couch behind our living room couch, but hopefully our garage turned playroom will be done soon!
This was the original closed off view from our front door. We opened it up which means we will have to do a little better job of keeping it cleaned.
We spruced up the entry way a tad. The door people messed up on measuring. Instead of waiting another few weeks, Wes offered to buy the door at a big discount, trimmed the bottom a little, and installed it himself. This saved A LOT!!
The hallway was blown open and the ladders give it a nice touch!
I stained a lot of wood...
I still have a couple door frames to stain, but I needed a break!
The kids bath had wallpaper falling off the wall. We lifted the ceiling over the tub and found tile that was discontinued at just 50 cents a piece!
As much as we loved the green and white sink, we decided to get a little bigger one. Avery is not excited about sharing a sink with Zane, but I have a feeling she will survive.
We removed one of the master closets in order to get me my tub...
Doing this made the tiny master bathroom into a tight, but full master bath. We need to order the glass shower surround. That's our goal for this weekend!
We are still working on our bathroom (mirror, light, staining vanity), but I like being able to close it off from our bedroom. I'm not a fan of open concept when it comes to bathrooms!
We still have some little random things we need to finish, but most of the living space is complete. We are now working on the big jobs of converting a garage to a playroom and then having a new garage built. We have decided to be the general contractors so we will see how that process goes!!
.jpg)
.jpg)
.jpg)
+(1024x768).jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)