Thursday, March 26, 2015

Big Project Take 2

Here We Go Again!
We transformed our current house last year and this year we are transforming another one.

Last year was a very big learning curve, but for the most part, we loved it!
We spent 2-3 months doing the inside and then around 5 months building on. We still have little finishing touches, but once we got the final inspection, we kinda just quit. It was livable and we were just ready to rest...and then we got a little side tracked...
When we moved last year, our plan was to get two houses for the same price as our one. The rent of one would pay for the one we lived in. That way, no matter what happens in the future, we will have a house that we won't have to worry about (for the most part). Well, here is our before pics of the little beauty...
The exterior was a tad creepy but the mirror wall in the living room won me over. I actually loved the size of the kitchen but the layout was ridiculous. The fridge was in the dining room and the door couldn't open all the way because the dishwasher was in the way.

We decided get rid of the pantry in order to bring the fridge into the kitchen. Well, after taking the countertops off, we realized the sink was previously on the left side of the kitchen and realized the fridge was where they had moved the sink to. I have no idea why they did that, but we had already made the new spot for the fridge, so we just made a new pantry.
 See the little space in the left corner. Crazy place for a fridge, huh? I love how you can fit a long table and several bar-stools though!

The one thing I didn't paint is the kitchen cabinets. I wanted those sanded down and sprayed. Plus, I didn't feel like cleaning out the nasty cabinets, so I let him do that before spraying! Love the big track light too. It fits perfectly and we don't have to install several recessed lights.

 I cannot believe how fast this house is going. We have only been working on it for 2.5 weeks. I have painted every. single. room. Trim, doors, walls, ceiling, closets, everything.

We also replaced all lighting and even outlets and light switches
We had the ceilings dry scraped so we didn't have to mess with sanding smooth or texturing. The dry scrape left a texture that was similar to the walls and I thought it looked just fine. Much better and less time consuming.
My favorite room in the house might just be this tiny closet bathroom. It was a small powder room and to the right of it was a linen closet. We made the linen closet into a shower. The sink is super tiny, but its cute and gets the job done..hopefully!
The other bathroom is almost done. Please don't look too closely at the tile! The subway was supposed to be an accent. This is what happens when communication fails. Ha. Oh well, its always going to be covered by a curtain. It wasn't worth knocking down the top foot and replacing with the 4x4's.
Oh, did I mention I'm also painting the entire exterior? We had a 5 gal bucket of the dark grey that was from our current house and so I just wanted to use it. It's so much easier when we use the same paint colors instead of keeping millions of paint cans at our house. So, it's darker than I'd prefer with the dark brown brick, but I'm hoping the white garage door and trim will help brighten it up.
I love the new floors! I've only had them for a day, but so far, I'd buy them again!

Windows are getting installed tomorrow so that will be exciting. If you or anyone you know is interested in a 4bd 2ba updated home for rent (possible sale), we are hoping this is ready in a couple of weeks!